AN ANALYSIS OF CHANGE ORDERS IN PUBLIC SCHOOL PROJECTS

机译:公立学校变革秩序的分析

获取原文

摘要

In the construction phase of Design-Bid-Build projects, change orders are among the important aspects that can affect the success of the projects. Change orders in any project adversely affect the project cost and schedule performance. Therefore, change orders should be controlled in order for greater success of the project. It is very important to determine change order costs in new and modernization projects as well as the association between the change orders cost and construction cost growth and schedule growth. This study statistically compared change orders for 171 modernization projects and 98 new projects in public schools built by the Clark County School District (CCSD) of Nevada and constructed from 2001 to 2009. The study collected the total cost of change orders, bid cost, final construction cost, bid duration, and final completion duration of modernization and new school projects. The analysis of variance (ANOVA) and Pearson Correlation tests were used to determine the statistical difference in change order costs and also the association between change order costs and both the construction cost and schedule growth of these projects. The findings of this study are presented in this paper.
机译:在设计投标构建项目的构建阶段,变更单是可能影响项目成功的重要方面。任何项目中的变更单都会对项目成本和进度绩效产生不利影响。因此,应该控制变更单,以使项目取得更大的成功。确定新建和现代化项目中的变更单成本以及变更单成本与建筑成本增长和进度增长之间的关联非常重要。这项研究从统计上比较了内华达州克拉克县学区(CCSD)于2001年至2009年建造的公立学校的171个现代化项目和98个新项目的变更单。该研究收集了变更单的总成本,投标成本,最终成本。现代化和新学校项目的建设成本,投标期限和最终完成期限。方差分析(ANOVA)和Pearson相关检验用于确定变更单成本的统计差异,以及变更单成本与这些项目的建设成本和进度增长之间的关联。本文介绍了这项研究的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号