Delays in construction projects - Causes and impacts

机译:建设项目延迟 - 原因和影响

获取原文

摘要

The main aim of this paper is to identify the main causes for the delays in the Portuguese construction industry and its impact, with the purpose of increasing knowledge on the causes and impacts of delays in construction projects. The Relative Importance Index was adopted to classify the importance of the 47 causes and six impacts identified causes of delays. Results show the main causes of delay are slow decisionmaking, changes to orders, unrealistic timescales and poor contract specifications, financial constraints on the contractor and the type of bidding and contract award process. The main impacts are time and cost overruns and disputes. Factor analysis revealed eight high-level causes that result in 26 of the original causes. Finally, Pearson correlation coefficients were calculated to find the relationship between the extracted factors (latent causes) and impacts, revealing that lack of commitment and substandard contracts are positively correlated with all impacts, and poor consultant performance is negatively correlated with time overrun. These findings are expected to improve the scientific community's knowledge of construction management.
机译:本文的主要目的是确定葡萄牙建筑业延误及其影响的主要原因,目的是提高关于建筑项目延误的原因和影响的知识。采用相对重要指标来分类47个原因的重要性,六个影响达到延误原因。结果表明,延迟的主要原因是慢的决策,对订单,不切实际的时间表和合同规范差,承包商的财务限制以及招标和合同奖励流程的变化。主要影响是时间和成本超支和纠纷。因子分析显示出八个高级原因,导致26个原始原因。最后,计算Pearson相关系数以找到提取的因素(潜在原因)和影响之间的关系,揭示缺乏承诺和不合格的合同与所有影响正相关,顾问业绩差与时间过度呈负相关。这些调查结果预计将提高科学界的施工管理知识。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号