Back to the Future: The Modernization of a Historic Mill Village Community

机译:回归未来:历史悠久的磨坊村社区的现代化

获取原文

摘要

Spartanburg Water retained CDM Smith, Inc. (CDM Smith), Greenville SC, to design and manage the construction of a collection system rehabilitation project in the Beaumont Village of Spartanburg, SC. Beaumont Village, designated as a local historic district neighborhood in 2011, was built, owned, and maintained by a local cotton mill during the great southern textile boom of the early 1900’s. In the 1980’s the City of Spartanburg was prescribed ownership of the sewer system when the mill was decommissioned. It was in 2008 that the City of Spartanburg transferred ownership of the entire city collection system to the Spartanburg Sanitary Sewer District (aka Spartanburg Water). The two entities entered into an agreement at that time to jointly fund an upgrade of the existing collection system in the Beaumont Village. The collection system for Beaumont Village was constructed in the early 1900s as the homes in the Mill Village were built. The system traversed streets, railroads and backyards and consisted of vitrified clay pipes (some inadequately sized), limited manholes and access points, and pipes that had reached the end of their useful life. In order to minimize the impacts of the rehabilitation project to the streets, residential property and the residents’ lives of the Village, Spartanburg Water wanted to maximize the use of trenchless technologies, thus cured-in-place pipe (CIPP) lining and pipe bursting were the primary practices employed throughout the system rehabilitation. The project rehabilitated over 15,350 linear feet of 8-inch and 6-inch vitrified clay pipe utilizing primarily cured-in-place and pipe bursting construction methods with conventional open cut methods being used as sparingly as possible. Construction also involved installation of over 5450 linear feet of 4-inch service line piping and 47 manholes and meter box access points throughout the system. During the design phase prior to construction, the contractor was required to physically locate and create video records of all the sewer lines sighted for rehabilitation in a preliminary closed circuit TV analysis of the system. Preconstruction video logs and “potholing” the existing sewer system revealed numerous sections of broken pipe, unaccounted for service laterals, tree root damage, unrecorded pipe repairs, and home additions and outbuildings constructed over the sewer lines. Field investigations also revealed a water distribution system placed in the same trench as the sewer line when the community was built, which at times made it difficult to make repairs to the sewer system without impacting the water service to the residents. All of these challenges required CDM Smith, Spartanburg Water, and the contractor to frequently ”field engineer” these situations when encountered so that the proposed construction schedule could be met. The project was bid in January 2011 using a bid form that included CIPP, pipe bursting and open-cut replacement unit prices to allow Spartanburg Water to switch between rehabilitation methods as site conditions warranted. The project was awarded to Portland Utilities Construction Company, Inc., of Portland TN with project completion expected in September, 2011. This paper will present a case study examining the issues that led to the selection of the appropriate rehabilitation technologies, design, permitting and construction challenges.
机译:斯帕坦堡水保留CDM史密斯公司(CDM史密斯),格林维尔SC,设计和管理斯巴达堡,SC的博蒙特村收集系统改造项目的建设。博蒙特村,2011年被指定为当地的历史区附近,建,拥有,由当地棉纺厂保持了1900年年初的南方大纺织繁荣时期。在1980年的斯帕坦堡市被规定的下水道系统的所有权时,磨退役。这是2008年该斯帕坦堡的城市转移整个城市收集系统的所有权斯帕坦堡污水管区(又名斯巴达堡的水)。当时签订协议的两个实体共同出资在博蒙特村现有的收集系统的升级。博蒙特村收集系统于20世纪初被构造成作为在磨村的房屋的建造。该系统走过的街道,铁路和后院,由这已经达到其使用寿命结束陶瓷瓦管(有些不足大小),限制沙井和接入点,以及管道。为了尽量减少对重建项目的街道,小区物业和居民的村庄生活的影响,斯帕坦堡水想最大限度地利用非开挖技术,从而治愈就地管(CIPP)内衬和管道爆裂在整个系统的康复所采用的主要做法。该项目的平反8英寸和6英寸的陶土管利用主要固化就地和管爆裂与常规明挖法施工方法使用尽可能少超过15350线性英尺。建设也是4英寸的服务线管道的整个系统在5450线性英尺和47个沙井和电表箱接入点参与的安装。在施工前的设计阶段,承包商被要求物理定位并在系统中创建的初步闭路电视分析近视康复的所有下水道的视频记录。施工前视频日志和“洞穴探险”现有的下水道系统揭示破管的众多部分,下落不明服务支线,树的根损害,未记录管道维修和家庭增加和附属建筑建造在下水道。实地调查还显示放置在同一个战壕当社区建成下水管道,这有时使其难以进行修理下水道系统,而不会影响自来水的居民配水系统。所有的这些挑战需要CDM史密斯,斯巴达水,和承包商经常“现场工程师”这种情况下遇到这样所提出的施工进度能否得到满足的时候。该项目使用,包括CIPP,爆管及明挖更换部件的价格,让斯帕坦堡水上康复方法之间切换的现场条件保证投标的形式在2011年1月出价。该项目被授予波特兰公用事业建设公司,公司,波特兰TN与项目完成预计9月,2011年本文将介绍一个案例分析,对这些问题,导致了适当的康复技术的选择,设计,审批和建设的挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号