DESIGN-BUILD OF WASTEWATER FORCE-MAIN IN NORTH BAY VILLAGE LESSONS LEARNED FROM THE DESIGN-BUILD TEAM'S PERSPECTIVE

机译:从设计团队的角度学习北湾村庄课程中的废水主要力量设计

获取原文

摘要

The City of North Bay Village (NBV) is a three-island community situated in northeast Miami-Dade County between the cities of Miami and Miami Beach. The three islands (North Bay Island, Harbor Island and Treasure Island) are linked by the John F. Kennedy (79th Street) Causeway, which extends across Biscayne Bay from Miami to Miami Beach.NBV is currently under a construction moratorium enforced by the Florida Department of Environmental Protection (FDEP). As such, NBV has completed a force main route evaluation and prepared a design-build criteria package so that a design-build Team can construct the force main and have it in service before December 31, 2011.NBV contracted METRO Equipment Services, Inc. (MES) and Lockwood, Andrews & Newnam, Inc. (LAN) to design and construct a new sanitary sewer force main to transmit NBV's sewage from NBV's Master Pumping Station to the Miami-Dade County - Water & Sewer Department's (MDWASD) 24-inch force main at the City of Miami.The project consisted of approximately 13,500 linear feet of 16-inch diameter pipeline and includes three horizontal directional drillings of 2,600 linear feet, 1,350 linear feet, and 1,150 linear feet across the environmentally sensitive Biscayne Bay and Pelican Harbor Bird Sanctuary.NBV's objective was to provide an opportunity for the selected Design-Build (DB) Team to be innovative in design and in construction methods while delivering the desired end result.In DB, the client solicits bids from Contractor/Engineer Teams based on incomplete plans. The prospective Design/Builders bid to complete the design while simultaneously starting construction. This overlap can shave months or even years off the schedule.Advantages of this delivery method include enhanced value-engineering and constructability reviews, early knowledge of guaranteed costs, accelerated delivery, lower design and engineering fees, reduced owner risk and administrative responsibilities.NBV undoubtedly learned many lessons throughout the course of the force main rehabilitation project. Our paper, however, will focus on the lessons learned from the Contractor's perspective.For both NBV and the METRO Team, this understanding reveals the strengths (and weaknesses) of this project delivery method. It sheds light on the effects of Design/Build policies and practices on the cost and schedule of large infrastructure projects.Utilities who understand the implications of their Design/Build procurement practices, contracts, oversight, management, and administration can be more effective in crafting their programs to meet project requirements.
机译:北湾村市(NBV)是一个三岛社区,位于迈阿密-戴德县东北部,位于迈阿密市和迈阿密海滩之间。这三个岛屿(北湾岛,海港岛和金银岛)由约翰·肯尼迪(第79街)铜锣连接,铜锣湾从迈阿密延伸至比斯坎湾,一直延伸至迈阿密海滩。环境保护部(FDEP)。因此,NBV已完成部队主干路线评估并准备了设计建造标准套件,以便设计建造团队可以建造部队主干并在2011年12月31日之前投入使用.NBV与METRO设备服务公司签约。 (MES)和Lockwood,Andrews&Newnam,Inc.(LAN)设计和建造新的卫生污水管网,将NBV的污水从NBV的主泵站输送到迈阿密戴德县-水和下水道部门(MDWASD)24-该项目包括约13,500线性英尺的16英寸直径的管道,并包括对环境敏感的比斯坎湾和鹈鹕的3个水平定向钻井,分别为2,600线性英尺,1,350线性英尺和1,150线性英尺。港口鸟类保护区(NBV)的目标是为选定的设计建造(DB)团队提供机会,使其在设计和施工方法方面进行创新,同时提供所需的最终结果。会根据不完整的计划向承包商/工程师团队征求投标书。预期的设计/建造者会在完成设计的同时开始施工。这种重叠可能使计划推迟数月甚至数年。这种交付方式的优点包括增强了价值工程和可施工性审查,对保证成本的早期了解,加速交付,降低了设计和工程费用,降低了所有者风险和行政责任。在部队主要康复项目的整个过程中吸取了很多教训。但是,我们的论文将集中于从承包商的角度汲取的经验教训。对于NBV和METRO团队而言,这种理解揭示了这种项目交付方法的优缺点。它揭示了设计/建造政策和实践对大型基础设施项目的成本和进度的影响。了解其设计/建造采购实践,合同,监督,管理和行政的含义的公用事业公司可以更有效地进行设计他们的程序可以满足项目要求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号