Behind the $740M: Building a Technical Consensus for Indianapolis Consent Decree Amendment No. 2

机译:落后于740亿美元:为印第安纳波利斯同意法令修正第2号建立技术达成

获取原文

摘要

The February 2011 Engineering News Record article “With a Modified Consent Decree, Indianapolis Is Cleaning Up” (ENR, 2011) provided a high-level summary of Amendment No. 2 to the Indianapolis Consent Decree (CD), which reduced estimated CSO program costs by $740 million. The CD modification has been celebrated by U.S. EPA as a “win-win” since it resulted in cost savings for the city and additional capture of CSO discharges. In May 2009, Indianapolis DPW and RebuildIndy program management team staff proposed to U.S. EPA Region 5 a modification of the CD for 14 of the 31 combined sewer control measures in the consent decree, including the deep tunnel system and the Southport advanced wastewater treatment (AWT) plant expansion, which are the two largest components of the consent decree. The amendment was formally approved and entered in December 2010. In order to be recommended for approval by EPA and DOJ staff, it was necessary for Indianapolis to demonstrate that the proposed modifications had better environmental benefits than the original CD that was entered in January 2007. The technical basis for proving the environmental benefits to EPA and DOJ included: 1 Hydraulic Modeling: A more detailed evaluation of the CSO system determined that average annual CSO volumes are approximately 30% lower than understood at the time of the original CD. This finding, in conjunction with the first CD amendment, allowed for smaller facilities to achieve the same performance criteria. The expansion and calibration of the hydraulic model since January 2007 was presented in detail to EPA to confirm the updated facility sizes. 2 Sustainability: The accepted modifications to the CD included a more sustainable plan, not from the standpoint of green infrastructure, but from the standpoint of shifting CSO control measures away from shallow interceptors, in-line storage, pump stations, and treatment expansions, and towards storage facilities with a longer service life, better reliability, and lower electrical and chemical usage. 3 Sewage Out Sooner: The accepted modifications to the CD included a lower average annual CSO discharge after full implementation than the original CD, and also allowed for accelerating key projects to capture an additional 3.5 billion gallons of CSO by full implementation.
机译:在2011年2月工程新闻记录文章“与修改同意令,印第安纳波利斯正在清理”(ENR,2011)提供的修正案第2号的一个高度概括印第安纳波利斯同意令(CD),从而减少估计CSO计划成本7.4亿美元。美国EPA庆祝CD修改,作为“双赢”,因为它导致城市的成本节省以及CSO排放的额外捕获。 2009年5月,印第安纳波利斯DPW和RebuildIndy项目管理团队的工作人员提出了美国EPA地区5所述的CD的同意法令31项合流控制措施,包括深层隧道系统和南港先进的废水处理14(修改AWT )植物扩张,这是同意法令的两个最大组成部分。该修正案被正式批准,并于2010年12月进入为了被推荐的EPA和司法部人员批准,印第安纳波利斯以证明这是必要的修改建议有比2007年1月进入原CD环保效益更佳。证明对环保署和司法的环境效益的技术基础包括:1个液压建模:对CSO系统的更详细评估确定,平均每年CSO体积比原始CD时平均低约30%。这一发现与第一个CD修正案结合允许较小的设施达到相同的性能标准。自2007年1月以来液压模型的扩展和校准详细介绍了EPA以确认更新的设施大小。 2可持续性:对CD的接受修改包括一个更可持续的计划,而不是从绿色基础设施的观点来看,而是从转移CSO控制措施远离浅拦截器,在线存储,泵站和治疗扩展的角度来看走向储存设施,具有较长的使用寿命,更好的可靠性和较低的电气和化学用途。 3次畅销较早:对CD的接受修改包括在全面实施之后的平均每年CSO放电,并且还允许通过全面实施加速关键项目以捕获额外的35亿加仑CSO。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号