For the problem of continuous container terminal production resources scheduling, based on the terminal operation efficiency of the system, within the daily work plan for the shortest waiting time of quay cranes and all lorries with the shortest operational time; the paper puts forward the container terminal and production resources scheduling model and presents the model based on the tabu search solutions, with an example.
展开▼