首页> 外文会议>2010 International Conference of Information Science and Management Engineering >Theory and Application of Expressway EPC Project Management Mode with Design Institute-Cored
【24h】

Theory and Application of Expressway EPC Project Management Mode with Design Institute-Cored

机译:以设计院为中心的高速公路EPC项目管理模式的理论与应用

获取原文

摘要

The traditional EPC project management mode with construction unit cored has many disadvantages in the expressway construction. Based on the trend that project management requires the design-construction integration, a new expressway EPC project management mode with design institute cored was put forward in this article. According to the concrete situation in our country, the necessity and advantages of the new expressway EPC project management mode were analyzed, the supervision system in the new expressway EPC project management mode were studied The management content and task of the owner and the design institute as the general contractor were described in detail. In the end, the applied research was done in the Baoding-Cangzhou expressway project construction. The research shows that the EPC project management mode with design institute cored has important theoretical value and economic value, it should be applied widely in the expressway construction.
机译:传统的以施工单元为核心的EPC项目管理模式在高速公路建设中存在很多弊端。针对项目管理需要设计与施工一体化的趋势,提出了一种以设计院为核心的高速公路EPC项目管理模式。根据我国的具体情况,分析了新型高速公路EPC项目管理模式的必要性和优势,研究了新型高速公路EPC项目管理模式的监督体系。对总承包商进行了详细描述。最后,在保定-沧州高速公路项目建设中进行了应用研究。研究表明,以设计院为核心的EPC项目管理模式具有重要的理论价值和经济价值,应在高速公路建设中广泛应用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号