A Study on the Performance Evaluation of Construction Project Integrated Management

机译:建设项目综合管理绩效评价研究

获取原文

摘要

In the integrated management system of construction projects, quality, schedule and cost are an entia in which they influence and restrict each other, and the change of anyone of the three objectives can induce the changes of the other two. So, how to make the performance evaluation of construction project integrated management objective and equitable, and provide a feasible reference benchmarking for integrated dynamic control, is a problem that should be studied carefully.Most previous project management performance evaluation method mainly adopted the single item linear analysis method. This method is easy, but can not reflect the complicated non-linear interaction between the evaluation indexes. In the light of the merit of BP artificial neural network method, the authors established a construction project integrated management performance evaluation model, which is based on the BP (back-propagation network) neural network, considering project time limit, quality requirements, cost, three major factors on construction project integration management.The analysis of a practical example shows that the evaluation results are more overall, scientific andobjective.
机译:在建设项目的综合管理系统中,质量,进度和成本是相互影响和制约的一个整体,三个目标中任何一个的变化都可以引起其他两个目标的变化。因此,如何使建设项目综合管理的绩效评价客观,公正,为综合动态控制提供可行的参考基准,是一个需要认真研究的问题。以往的大多数项目管理绩效评价方法主要采用单项线性法。分析方法。这种方法很容易,但是不能反映评估指标之间复杂的非线性交互作用。根据BP人工神经网络方法的优点,作者建立了基于BP(反向传播网络)神经网络的建设项目综合管理绩效评估模型,其中考虑了项目时限,质量要求,成本,实例分析表明,评价结果较为全面,科学,客观。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号