The Nairn Avenue Overpass is a 213 m long, 11-span, 4-lane + sidewalk precast prestressed concrete I-girder bridge over the CP Keewatin Subdivision line in Winnipeg, MB. The superstructure consists of three continuous segments with deck joints at piers #3 and #8. The structure was built in 1967, and underwent major strengthening and rehabilitation of the deck, girders, and bearings in 1985. Piers consist of a cast-in-place pier cap approximately 18 m long supported on two cast-in-place columns approximately 7 to 8 m tall supported on concrete pile caps over timber raft-pile foundations. Leaking omega-style strip seal deck joints at Pier #3 and Pier #8 have exposed the piers and girder ends to chloride contaminated run-off from the deck. In 2002, the pier caps were re-faced on three sides and provided with galvanic anode cathodic protection, and the pier columns received local patch repairs only. In 2014, during a deck rehabilitation project that included rehabilitating the deck joints, Morrison Hershfield (the Consultant) noted significant deterioration of pier column concrete including staining, moderate-to-severe cracking and localized spalling. The Consultant was subsequently engaged by the City of Winnipeg (City) to conduct a field investigation to quantify the degree of deterioration, evaluate alternatives, and undertake design and construction administration of the preferred solution. This presentation describes these steps, and lessons learned from the Contractor, Consultant, and Owner's perspective.
机译:Nairn大道立交桥是213米长,11跨度,4车道+人行道预制预应力混凝土I-Girder桥,在Winnipeg,MB中的CP Keewatin细分线。上部结构由三个连续段组成,码头#3和#8处具有甲板关节。该结构建于1967年,并于1985年进行了甲板,梁和轴承的重大加强和康复。码头包括一个大约18米长约18米长的墩帽大约约7在木材筏桩基础上的混凝土桩帽上有8米高。在码头#3和码头#8处泄漏的欧米茄式条形密封甲板接头暴露在甲板上的氯化物污染的径流。 2002年,墩帽在三面上重新面对并提供了电流阳极阴极保护,码头柱仅收到本地补丁维修。 2014年,在德克康复项目中,包括康复甲板关节的康复项目(顾问)(顾问)注意到墩柱混凝土的显着恶化,包括染色,中度至严重的裂缝和局部剥落。该顾问随后由温尼伯市(市)从事,进行实地调查,以量化劣化程度,评估替代品和承接首选解决方案的设计和建设管理。此演示文稿描述了这些步骤,以及从承包商,顾问和所有者的角度汲取的经验教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号