This paper describes concepts that have been developed for the layout of the FIRE buildings and facilities, and identifies major site requirements. The FIRE test cell, approximately 30/spl times/30 meters, is part of a structurally integrated tokamak and hot cell building. The tokamak centerline is set 4.2 m above the floor. Overhead space is sufficient to allow a bridge crane to remove the tie rod structure from the assembled tokamak. FIRE will be designed so that the thick outer wall of the vacuum vessel and the TF coils provide enough shielding so that the exterior of the machine remains accessible for hands-on maintenance. However, during operation and during maintenance activities that require the removal of a port plug additional shielding is required. A movable shield roof, which operates above the tokamak but below the crane, is provided to close the shield boundary during operations. The FIRE facility will have a tritium inventory large enough to require that it must be licensed by the NRC. A non-site-specific plot plan has been developed and is described. The tokamak-hot cell building is placed in the center of the site and arbitrarily oriented so crane rails run north-south, and the hot cell is to the north of the tokamak. Major electrical facilities are located to the west, while vacuum pumping, cooling, and tritium processing facilities are located to the east. Office space is provided for a laboratory staff assumed to be 800. All buildings and facilities are developed assuming a "green-field" site, and costs are estimated accordingly. Site requirements and alternative site selection strategies are described. Savings could be obtained if an existing facility, particularly one where nuclear licensing is already established, could be utilized.
机译:本文介绍了为FIRE建筑物和设施的布局而开发的概念,并确定了主要的场地要求。 FIRE测试室大约30 / spl次/ 30米,是结构上集成的托卡马克和热室建筑的一部分。托卡马克中心线设置在地面上方4.2 m。顶部空间足以允许桥式起重机从组装的托卡马克上卸下拉杆结构。 FIRE的设计应使真空容器的厚外壁和TF线圈提供足够的屏蔽,以便机器的外部仍可进行动手维护。然而,在需要移除端口插头的操作和维护活动期间,需要额外的屏蔽。在托卡马克上方但在起重机下方运行的可移动防护顶被设置为在操作过程中关闭防护边界。 FIRE设施的a存货量足够大,要求它必须由NRC许可。已经开发并描述了一个非特定地点的绘图计划。托卡马克热室大楼位于场地的中心,方向任意,因此吊车轨道从南向北延伸,而热室则位于托卡马克的北部。主要的电气设施位于西部,而真空泵,冷却和tri处理设施位于东部。为假定为800人的实验室人员提供了办公空间。所有建筑物和设施的开发均假定为“绿地”场地,并据此估算费用。描述了站点要求和替代站点选择策略。如果可以利用现有设施,特别是已经建立核许可证的设施,则可以节省费用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号