首页> 外文会议>IEEE/NPSS Symposium on Fusion Engineering >Facility and site needs for the fire project
【24h】

Facility and site needs for the fire project

机译:Fire项目的设施和网站需求

获取原文

摘要

This paper describes concepts that have been developed for the layout of the FIRE buildings and facilities, and identifies major site requirements. The FIRE test cell. approximately 30×30 meters, is part of a structurally integrated tokamak and hot cell building. The main operating floor is set at grade, and the tokamak centerline is set 4.2 m above the floor. Overhead space is sufficient to allow a bridge crane to remove the tie rod structure from the assembled tokamak. FIRE will be designed so that the thick outer wall of the vacuum vessel and the TF coils provide enough shielding so that the exterior of the machine remains accessible for hands-on maintenance. However, during operation, and during maintenance activities that require the removal of a port plug, additional shielding is required. A movable shield roof, which operates above the tokamak but below the crane, is provided to close the shield boundary during operations.
机译:本文介绍了为消防建筑和设施布局开发的概念,并确定了主要的网站要求。火试验单元。大约30×30米,是结构上集成的Tokamak和热电池建筑的一部分。主要的锻造楼层设定为等级,托卡马克中心线设置在地板上方4.2米。架空空间足以允许桥式起重机从组装的Tokamak中移除拉杆结构。将设计火灾,使真空容器和TF线圈的厚外壁提供足够的屏蔽,使得机器的外部仍然可用于动手维护。但是,在操作期间,在需要拆除端口插头的维护活动期间,需要额外的屏蔽。提供一种可移动的屏蔽屋顶,该屏蔽屋顶在托克马克上方操作,但在起重机下方,以在操作期间关闭屏蔽边界。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号