An algorithm for differential protection of parallel-teed transmission lines is proposed in this paper. The technique requires that sampling of data at the terminals of the line be synchronized. An easy-to-be-implement synchronization technique is suggested. The algorithm was simulated on a Sun Spar C workstation using the EMTDC software. Results of the simulations show that the algorithm performs well. Typical test cases are reported in the paper to demonstrate the effectiveness of the algorithm.
展开▼