首页> 外文会议>IET Professional Development Course on Electric Traction Systems >Electrical multiple unit testing: commissioning to overhaul
【24h】

Electrical multiple unit testing: commissioning to overhaul

机译:电气多单元测试:调试到大修

获取原文

摘要

Throughout the service life of an Electrical Multiple Unit (EMU), the EMU shall undergo many varied electrical and mechanical testing regimes to ensure technical and functional compliance is maintained and therefore ensure safe and reliable operation. The initial stage of testing is known as commissioning and for Rolling Stock Manufacturers, the function of Commissioning is to ensure and maintain the critical link between production and the delivery of new rail vehicles to the customer. The first section of this paper shall therefore begin with a definition of the term “commissioning” followed by an overview of prevailing legislation that affects the introduction of new EMUs. Thereafter the introduction phases shall be discussed in more detail. The paper shall look at some of the issues and factors that can affect the handover of the new EMU to the Train Operator and then look at the role of the Commissioning Team. The second section of this paper shall then look at electrical testing beyond the commissioning phase and detail the rationale behind test clause breakdown with regards to routine and overhaul maintenance regimes.
机译:在整个电力动车组(EMU)的使用寿命,动车组将进行许多不同的电气和机械测试制度,以确保技术和功能的合规性保持,因此确保运行安全可靠。测试的初始阶段被称为调试和车辆制造商,调试的功能是确保和维持生产,并给客户提供新轨道车辆之间的关键环节。因此,本文的第一部分应与术语“调试”之后现行立法,影响了引进新动车组的概要的定义开始。此后引入相应更详细地讨论。本文将着眼于一些可能影响新动车组列车运营的交接,然后看看调试队伍的作用的问题和因素。那么本文的第二部分将着眼于超越了调试阶段和细节背后的测试条款击穿的理由与问候和日常检修维护制度电气测试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号