首页> 外文会议>International Annual Conference of the American Society for Engineering Management >STUDY OF COST OVERRUN AND DELAYS OF Department of Defense (DoD) 's SPACE ACQUISITION PROGRAM
【24h】

STUDY OF COST OVERRUN AND DELAYS OF Department of Defense (DoD) 's SPACE ACQUISITION PROGRAM

机译:国防部成本超支与延误的研究(国防部)空间收购计划

获取原文

摘要

Defense and Aerospace Systems Acquisition projects, just like any other Large-Scale Complex Engineered Systems (LSCES) experience delays and cost overrun during the acquisition process. Cost overrun and delays in LSCES are due, in part, to high complexity, size of the project, involvement of various stakeholders, organizations, political disruptions, changes in requirements and scope. These uncertainties, due to the exogenous factors, have cost the federal government billions of dollars and delays in completion of the programs. Cost estimation of federal programs is usually based on previous generations of systems produced and almost all the time the costs are underestimated. Underestimation of the cost of the programs is an endogenous factor, which results in cost overrun for any program, the behavior of the cost escalation is pre-forecasted to be normally distributed, but due to the cost overrun, the cost escalation curve may be skewed. In this paper, the authors will be studying the cost escalation and time delays of the Advanced Extremely High Frequency (AEHF), a DoD's space acquisition program. The distribution of the cost and time can aid in understanding the effects of endogenous factors influencing the cost overrun and the effect of change in requirements during the acquisition process. This data will serve as a foundation for further research to create a framework, which will be used, in better forecasting of the cost of the acquisition of the programs.
机译:防御和航空航天系统采集项目,就像任何其他大规模的复杂工程系统(LSCES)在采集过程中经历延迟和成本超支。成本超支和LSCE的延误部分是部分,部分地点,项目的大小,各种利益攸关方,组织,政治中断,要求和范围的变化的程度。由于外源性因素,这些不确定性使联邦政府的成本降低了数十亿美元和延误计划。联邦方案的成本估算通常基于以前的一代制造的系统,并且几乎所有时间都低估了。低估程序的成本是内源性因素,这导致任何程序的成本超支,预测成本升级的行为是通常分布的,而是由于成本超支,成本升级曲线可能是倾斜的。在本文中,作者将研究高级极高频率(AEHF)的成本升级和时间延迟,是国防部的空间采集计划。成本和时间的分布可以有助于了解影响成本超支的内源性因素的影响以及在收购过程中对需求变化的影响。该数据将作为进一步研究创建框架的基础,以便更好地预测采购计划的成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号