首页> 美国政府科技报告 >Does A Rubber Baseline Guarantee Overruns. A Study of Cost Performance andContract Changes in Major Defense Acquisition Programs
【24h】

Does A Rubber Baseline Guarantee Overruns. A Study of Cost Performance andContract Changes in Major Defense Acquisition Programs

机译:橡胶基线保证是否超支。主要国防采办项目的成本绩效与契约变化研究

获取原文

摘要

This thesis explores the assumption that cost overruns are related to contractchanges. A common assertion in defense literature says that contracts which are relatively stable suffer smaller overruns than those which are highly volatile. The stability or volatility of contracts is characterized by their change history. A contract which is modified frequently or by large amounts is more unstable, or volatile, than one which is not changed either as often or by lesser amounts. This study attempts to find evidence supporting this common assertion by examining the relationship between cost growth and baseline stability on over 400 Major Defense Acquisition Program contracts over the last 26 years. The results are intriguing because, counter-intuitively, no significant evidence is found. Possible explanations and implications of this discovery are provided.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号