首页> 外文会议>Triannual international conference on ports >Wharf Improvements for New Panamax Size Vessels
【24h】

Wharf Improvements for New Panamax Size Vessels

机译:新巴拿马型船舶的码头改进

获取原文

摘要

Recently completed improvements to South Carolina Ports Authority's (SCPA) Wando Welch Terminal's (WWT) 3,800-foot (1,158 m) wharf repaired and upgraded waterfront infrastructure to accommodate larger container vessels. As a result, the Wando Welch Terminal went from accommodating 8,000 twenty-foot equivalent (TEU) container vessels to 14,000 TEU vessels. Improvements included the following items: replacing crane rail beams, crane rails, bollards, fender systems, pin sockets, and crane tie-downs for ship-to-shore (STS) cranes, adding new concrete foundation piles, and existing pile repairs. Construction phasing was incorporated to maintain vessel operations and accommodate the arrival of STS cranes during construction. The work was performed over 33 months and showed that with proper planning, the improvements could be made while maintaining berth operations and accommodating other concurrent capital projects. This paper presents the design and operational considerations, as well as the construction challenges, of improving the WWT wharf infrastructure.
机译:南卡罗来纳州港口管理局(SCPA)的旺多韦尔奇码头(WWT)最近完成了对3,800英尺(1,158 m)码头的改进,维修并升级了滨水基础设施,以容纳更大的集装箱船。结果,Wando Welch码头从容纳的8,000二十英尺当量(TEU)集装箱船变成了14,000 TEU船。改进包括以下项目:更换起重机轨道梁,起重机轨道,系缆柱,挡泥板系统,销钉插孔以及船对岸(STS)起重机的起重机系固装置,增加新的混凝土基础桩,并进行现有的桩修复。施工阶段被合并以维持船舶运行并在施工过程中适应STS起重机的到来。这项工作进行了33个月,结果表明,通过适当的计划,可以在保持泊位运营和容纳其他并行资本项目的同时进行改进。本文介绍了改善WWT码头基础设施的设计和操作注意事项,以及施工方面的挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号