首页> 外文会议>Triannual international conference on ports >Wharf Improvements for New Panamax Size Vessels
【24h】

Wharf Improvements for New Panamax Size Vessels

机译:新的巴拿马尺寸容器的码头改进

获取原文

摘要

Recently completed improvements to South Carolina Ports Authority's (SCPA) Wando Welch Terminal's (WWT) 3,800-foot (1,158 m) wharf repaired and upgraded waterfront infrastructure to accommodate larger container vessels. As a result, the Wando Welch Terminal went from accommodating 8,000 twenty-foot equivalent (TEU) container vessels to 14,000 TEU vessels. Improvements included the following items: replacing crane rail beams, crane rails, bollards, fender systems, pin sockets, and crane tie-downs for ship-to-shore (STS) cranes, adding new concrete foundation piles, and existing pile repairs. Construction phasing was incorporated to maintain vessel operations and accommodate the arrival of STS cranes during construction. The work was performed over 33 months and showed that with proper planning, the improvements could be made while maintaining berth operations and accommodating other concurrent capital projects. This paper presents the design and operational considerations, as well as the construction challenges, of improving the WWT wharf infrastructure.
机译:最近完成了南卡罗来纳港的改进港口权限(SCPA)Wando Welch终端(WWT)3,800英尺(1,158米)码头修复和升级的海滨基础设施以容纳更大的集装箱船。因此,Wando Welch终端从容纳8,000个二十英尺的等效(TEU)集装箱容器到14,000个TEU船只。改进包括以下项目:更换起重机轨道梁,起重机轨道,铺柱,挡泥板,挡泥板,销插座,以及用于船舶到岸(STS)起重机的起重机,加入新的混凝土基坑和现有桩修理。施工阶段被纳入维持血管操作,并在施工过程中容纳STS起重机的到来。这项工作是在33个月内进行的,并显示,通过适当的规划,可以在维护泊位运营并容纳其他并行资本项目的同时进行改进。本文提出了改善WWT码头基础设施的设计和操作考虑,以及建设挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号