首页> 外文会议>International Conference on Industrial Engineering >Approach to Determining Order of Production of Parts and Assembly Units of Engineering Products in Production Process Planning
【24h】

Approach to Determining Order of Production of Parts and Assembly Units of Engineering Products in Production Process Planning

机译:生产过程规划中工程产品零件和装配单位生产顺序的方法

获取原文

摘要

The paper investigates the production planning process. Due to the large dimensions and complex constraints of the production sequencee of parts and assembly units, the process-planning problem belongs to the NP-complex class. The aim of the work was to develop an algorithm that allows forming a feasible schedule, which is close to the optimum, minimizing the length of the production cycle. The authors propose an algorithm for determining the order of the item and assembly processing units of the product to entitle it "Falling Leaves". The algorithm is based on a stratified cutting the end vertices (leaves) of the tree structure of electronic products and ranking the group leaves depending on the duration of the production path. This approach allows us to start the production of products with the parts having the longest production cycle. Computational experiments on the products of varying complexity and the comparison with the existing algorithm have been conducted to determine the order of processing of parts and assembly units at the level of entry into the structure of the product. The results show that the developed algorithm "Falling Leaves" decreases the production cycle of products by 2% to 30%.
机译:本文调查了生产计划过程。由于部件和装配单元的生产序列的尺寸和复杂的约束,过程规划问题属于NP复数类。该工作的目的是开发一种允许形成可行的时间表的算法,其接近最佳,最小化生产周期的长度。作者提出了一种确定产品的项目和组装处理单元的顺序算法,以赋予其“落叶”。该算法基于电子产品树结构的分层切割端顶点(叶子),并根据生产路径的持续时间来排序组叶子。这种方法使我们能够使用具有最长的生产周期的部件开始生产产品。已经进行了对不同复杂性和与现有算法的比较的计算实验,以确定零件和装配单元的处理顺序,以进入产品的结构。结果表明,发达的算法“落叶”将产品的生产周期减少2%至30%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号