首页> 外文会议>European conference on soil mechanics and geotechnical >Back analyses of the instability mechanism encountered during the construction of tunnel Suhodol
【24h】

Back analyses of the instability mechanism encountered during the construction of tunnel Suhodol

机译:Suhodol隧道施工中遇到的失稳机理的反分析

获取原文

摘要

The tunnel Suhodol - T3 is a twin motorway tunnel, of approximate length of 2800m, located at the part of the Motorway at the Section Lepenica - Tarcin at Corridor Vc at Bosnia and Herzegovina. The tunnel excavation was carried out within the complex of Bosnian Schist Mountains. The geological structure was heavily affected by the tectonic forces, so that the majority of the tunnel excavation was carried out in poor to very poor rock. The instability problems occurred in the shale section, in which heavily weathered material was found during the progression through the fault zone, which was also water bearing. The numerical back analyses of the event were carried out with an aim to resolve the stress-strain and deformation field around the tunnel after the collapse. The parameters of the rock mass were adjusted so as to simulate the progression of the event. The same parameters were then used to devise the necessary remedial measures that were implemented in the right tube. The possible mechanisms of failure are discussed and the remedial measures, which were successfully applied, are described in the paper.
机译:Suhodol-T3隧道是一条双高速公路隧道,全长约2800m,位于波斯尼亚和黑塞哥维那Vc走廊Lepenica-Tarcin段的高速公路部分。隧道开挖是在波斯尼亚片岩山群中进行的。地质结构受到构造力的严重影响,因此大部分隧道开挖都是在不良至极差的岩石中进行的。页岩段存在不稳定性问题,在穿越断层带的过程中发现了严重风化的材料,该断层带也是含水的。为了解决倒塌后隧道周围的应力-应变和变形场,对该事件进行了数值反分析。调整岩体的参数,以模拟事件的进程。然后使用相同的参数来设计在右管中实施的必要补救措施。本文讨论了可能的故障机理,并介绍了成功应用的补救措施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号