首页> 外文会议>International conference on transportation engineering >Reinforcement and Monitoring Measures for Overlapped Shields Crossing underneath Railway Stations
【24h】

Reinforcement and Monitoring Measures for Overlapped Shields Crossing underneath Railway Stations

机译:铁路站下面横跨盾牌的加固和监测措施

获取原文

摘要

Shield tunneling method is widely used in urban metro construction at present. How to control the disturbance of shield construction on overlying soil and adjacent exist railways is an important issue in the development and utilization process of underground space. Based on the project, Shenzhen Metro Line 7 crossing underneath Shenzhen North Railway Station, this paper puts forward a set of reinforcement measures system for overlapped shield crossing underneath railway station. This paper concludes that full-bin mode tunneling, decreasing slag volume, accelerating the shield tunneling speed, and early synchronous grouting are effective methods for controlling stratum deformation, which are verified by field monitoring. The research conclusion can provide some reference for the similar engineering in the future.
机译:盾构隧道法目前广泛应用于城市地铁建设。 如何控制覆盖土壤上盾构建设的障碍,存在铁路是地下空间开发和利用过程中的一个重要问题。 基于该项目,深圳地铁7号线在深圳北火车站下划线,本文提出了一套加固措施,用于铁路站下面的重叠盾牌。 本文得出结论,全站仪模式隧道,降低渣体积,加速屏蔽隧道速度以及早期同步灌浆是控制地层变形的有效方法,通过现场监测验证。 研究结论可以为未来的类似工程提供一些参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号