首页> 外文会议>Engineers' Society of Western Pennsylvania;Annual International Bridge Conference >Steel Truss Bridge Redundancy Combined with Construction over a Busy Rail Yard
【24h】

Steel Truss Bridge Redundancy Combined with Construction over a Busy Rail Yard

机译:钢桁架桥的冗余与繁忙的铁路场的施工相结合

获取原文

摘要

The St. Anthony Parkway steel truss bridge replacement project, located in Minneapolis, Minnesota,USA, and crossing over the BNSF Northtown rail yard, incorporates unique load path and internal redundancymeasures including eliminating fracture critical steel truss members and gusset plates and using a post-tensionedconcrete bottom chord. The replacement of the existing truss spans will require specialized constructiontechniques to minimize impacts to BNSF’s heavily used rail yard including launching beams to remove the existingtrusses and install the new truss span.
机译:位于明尼苏达州明尼阿波利斯的圣安东尼大路钢桁架桥更换项目 美国,跨越BNSF北镇铁路场,结合了独特的装载路径和内部冗余 采取的措施包括消除严重断裂的钢桁架构件和角撑板,以及使用后张紧 混凝土底弦。更换现有的桁架跨度将需要专门的建筑 减少对BNSF频繁使用的铁路货场的影响的技术,包括发射梁以移除现有的 桁架并安装新的桁架跨度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号