首页> 外文会议>International pipeline conference >Husky moose mountain pipeline: a case study of planning, environmental assessment construction
【24h】

Husky moose mountain pipeline: a case study of planning, environmental assessment construction

机译:哈士奇驼鹿山管道:一种案例研究规划,环境评估与建设

获取原文
获取外文期刊封面目录资料

摘要

In 1998, Husky Oil Operations Limited and its partner formerly Rigel Oil, (purchased by Talisman Energy in 1999), constructed a 26.2 km pipeliine in kananaskis Country to transport sour oil, solution gas and produced water from P)ad #3 on Cox Hill to the Shell Oil Jumping Pound Gas Plant for processing. Kananaskis Country is a 4160 km~2 "Planning Area" that has both Prime Protection and Multiple Use designations. Situated just west of Calgary, Alberta, Canada it has considerable recreational and environmental value, including significant wildiolfe habitat.
机译:1998年,哈士奇石油运营有限公司及其伴侣以前的石油公司(1999年由护身符)购买,在Kananaskis国家建造了26.2公里的管道,在Cox山上运输酸性油,溶液气体和生产的水。到壳体油跳磅煤气厂进行加工。 Kananaskis国家是4160公里〜2“规划区”,具有主要保护和多种使用标识。位于卡尔加里的西部,加拿大艾伯塔省以西,拥有相当大的娱乐和环境价值,包括重要的野生士栖息地。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号