首页> 美国政府科技报告 >Environmental Assessment. Construction and Maintenance of Wastewater Pipelines and Lift Stations and Installation of Fiber Optic Conduit at Eglin Air Force Base, Florida
【24h】

Environmental Assessment. Construction and Maintenance of Wastewater Pipelines and Lift Stations and Installation of Fiber Optic Conduit at Eglin Air Force Base, Florida

机译:环境评估。佛罗里达州埃格林空军基地污水管道和提升站的建设和维护以及光纤导管的安装

获取原文

摘要

The Proposed Action is part of a larger effort to privatize wastewater collection and treatment on Eglin AFB. The base currently operates its own wastewater treatment plants (WWTPs) and disposes of the wastewater effluent and sludge to designated spray irrigation fields and a land application site. Privatizing the WWTPs and leasing the spray irrigation fields to the Okaloosa County Water and Sewer (OCWS) would reduce Air Force cost to operate and maintain these facilities on a life cycle analysis basis and would increase wastewater treatment efficiencies. Upon completion of the project, Eglin AFB would cease operation of its WWTPs and transfer wastewater to the OCWS Arbennie Pritchett Water Reclamation Facility (APWRF), a new state-of-the- art facility constructed by OCWS on Eglin AFB south of Range Road (RR) 234 and RR 636 intersection, about 5 miles west of Eglin main base.

著录项

  • 作者

  • 作者单位
  • 年度 2012
  • 页码 1-190
  • 总页数 190
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业技术;
  • 关键词

    Eglin air force base(Florida);

    机译:埃格林空军基地(佛罗里达州);

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号