Assessment of the Requirements for the Application of Tee-OFF Circuit-Breakers in Modern Power Plant Layouts

机译:评估在现代电厂布局中应用TEE-OFF断路器的要求

获取原文

摘要

Nowadays there is a continuously increasing trend to equip power plant layouts with a circuit-breaker installed at the higher voltage side of the unit auxiliary transformer. A major concern in this respect is that the design, testing and application requirements for this circuit-breaker are not standardised. Due to its installation location, this circuit-breaker has to handle currents of very high magnitude which can also exhibit delayed zero crossings. Moreover, these currents are associated to very steep transient recovery voltages which often exceed the tested capability of conventional distribution circuit-breakers. This paper is specifically concerned with a global survey of different power plants to identify the requirements for application of the circuit-breakers installed at the higher voltage side of the unit auxiliary transformers. The fault transients simulations have been performed by means of the Electromagnetic Transients Program (EMTP). A methodology to properly select the adequate circuit-breaker is finally proposed.
机译:如今,使用安装在单元辅助变压器的较高电压侧的断路器的电力设备布局,存在连续增加的趋势。在这方面的主要问题是该断路器的设计,测试和应用要求不标准化。由于其安装位置,该断路器必须处理非常高幅度的电流,也可以表现出延迟过零点。此外,这些电流与非常陡峭的瞬态恢复电压相关联,该电流通常超过传统分配断路器的测试能力。本文特别关注对不同发电厂的全球调查,以识别安装在单元辅助变压器较高电压侧的断路器的应用要求。通过电磁瞬变程序(EMTP)执行了故障瞬变仿真。最后提出了一种正确选择足够断路器的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号