Problem analysis and probable solution of existing interconnected grid system of Chittagong region

机译:Chittagong地区现有互联网系统的问题分析及可能解决方案

获取原文

摘要

Power crisis is one of the foremost concerning problem in Bangladesh. The gap between demand and production is increasing day by day. System loss, transmission loss and established connection to grid without upcoming load plan are main issues regarding this crisis. It is possible to control this crisis by taking some necessary steps such as system loss reduction, establishing efficient interconnection, assembling necessary substation etc. Priority should be given to transmission and distribution of electrical energy through the proper way. This paper represents a case study and analysis to find out the key problems of existing power system including generating station, interconnected grid system and substations of Chittagong. Existing generating station with their generating capacity, transmission lines with their length as well as conductor grade and substation with its load are studied to figure out the major problems and finally it offers smoe probable solutions of these problems.
机译:电力危机是孟加拉国最重要的问题之一。需求与生产之间的差距日益增加。没有即将到来的负载计划的系统丢失,传输损耗和与网格的建立连接是关于这一危机的主要问题。通过采取一些必要的步骤,可以通过诸如系统损失减少,建立有效的互连,组装必要的变电站等的必要步骤来控制这一危机。优先应通过正确的方式传输和分配电能。本文代表了一个案例研究和分析,了解现有电力系统的关键问题,包括发电站,互联网系统和赤棕刚的变电站。研究了具有它们的发电能力,具有它们长度的传输线以及具有其负荷的导线等级和变电站的发电站,以弄清楚主要问题,最后它提供了这些问题的Smoe可能的解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号