Problem analysis and probable solution of existing interconnected grid system of Chittagong region

机译:吉大港地区现有互联电网系统的问题分析和可能的解决方案

获取原文

摘要

Power crisis is one of the foremost concerning problem in Bangladesh. The gap between demand and production is increasing day by day. System loss, transmission loss and established connection to grid without upcoming load plan are main issues regarding this crisis. It is possible to control this crisis by taking some necessary steps such as system loss reduction, establishing efficient interconnection, assembling necessary substation etc. Priority should be given to transmission and distribution of electrical energy through the proper way. This paper represents a case study and analysis to find out the key problems of existing power system including generating station, interconnected grid system and substations of Chittagong. Existing generating station with their generating capacity, transmission lines with their length as well as conductor grade and substation with its load are studied to figure out the major problems and finally it offers smoe probable solutions of these problems.
机译:电力危机是孟加拉国最重要的问题之一。需求与生产之间的差距正在日益扩大。与该危机有关的主要问题是系统损失,传输损失以及与电网的已建立连接而没有即将进行的负载计划。可以通过采取一些必要的步骤来控制这种危机,例如减少系统损耗,建立有效的互连,组装必要的变电站等。应优先考虑通过适当的方式传输和分配电能。本文是一个案例研究和分析,旨在找出吉大港市现有的发电系统,发电站,互联电网系统和变电站等关键问题。研究了现有发电站的发电量,输电线路的长度,导体的等级以及变电站的负荷,以找出主要问题,并最终为这些问题提供了可能的解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号