首页> 外文会议>Annual International Bridge Conference >Erection Engineering Considerations for Horizontally Curved Steel I-Girder Bridges
【24h】

Erection Engineering Considerations for Horizontally Curved Steel I-Girder Bridges

机译:水平弯曲钢I梁桥的安装工程考虑因素

获取原文

摘要

The erection of horizontally curved steel l-girder bridges is inherently more complex than the erection of straight l-girder bridges of similar span lengths, which is a direct result of the natural behavior of curved steel I-girders. Bridge engineers must be aware of these complexities as they are more frequently being tasked with developing or reviewing erection plans for curved steel l-girder bridges. However, there is limited guidance given in the governing design specifications and archival literature that illustrates what is required in the design and construction plans for curved steel l-girders during erection stages and the calculations that need to be carried out. Based upon the authors' experience, this paper will highlight aspects of curved steel l-girder bridge erection that should be considered by the design engineer and the contractor's engineer in the development of the steel erection plans, so as to provide for a successful bridge construction project.
机译:水平弯曲钢L-梁桥的勃起本质上比类似跨度长度的直线梁桥架更复杂,这是弯曲钢I-梁的自然行为的直接结果。桥梁工程师必须了解这些复杂性,因为它们更频繁地在开发或审查弯曲钢L梁桥的安装计划时。然而,管理设计规范和档案文献中提供了有限的指导,其说明了在勃起阶段的弯曲钢L型梁的设计和施工计划中所需的必要条件以及需要进行的计算。基于作者的经验,本文将突出弯曲钢L-Girder桥架的各个方面,这些方面应由设计工程师和承包商工程师在钢结构计划的发展中考虑,以便提供成功的桥梁建设项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号