首页> 外国专利> ERECTION ENGINEERING METHOD FOR STEEL BRIDGE UPPER AND AND LOWER PART STRUCTURE

ERECTION ENGINEERING METHOD FOR STEEL BRIDGE UPPER AND AND LOWER PART STRUCTURE

机译:钢桥上下结构的架设工程方法

摘要

PURPOSE: To provide an erection engineering method for economical steel bridge upper and lower part structures adopting a module system advantageous in view of short-term erection of the proper bridge which is favorable for long time use and early service. ;CONSTITUTION: A bridge upper part structure as a permanent structure is divided into modules 1, moved to a designated position in a site by a moving device 2 also serving as a temporary support, connected to each other into one body by a temporary connecting device 3 and then the road surface is served as a temporary bridge. After that, separately the bridge upper part structure 4 is permanently connected by a permanent adding member, and a bridge pier 5 as a permanent support is replaced with the temporary support.;COPYRIGHT: (C)1994,JPO&Japio
机译:目的:提供一种经济的钢桥上部和下部结构的安装工程方法,该模块采用的模块系统有利于长期使用和早期使用的有利桥梁的短期安装。组成:桥梁上部结构作为永久性结构分为模块1,通过移动设备2(也用作临时支撑物)移动到现场的指定位置,并通过临时连接设备彼此连接成一体3,然后将路面用作临时桥梁。之后,分别通过永久性添加构件永久性地连接桥上部结构4,并用临时支撑物代替作为永久支撑物的桥墩5。版权所有:(C)1994,JPO&Japio

著录项

  • 公开/公告号JPH06272214A

    专利类型

  • 公开/公告日1994-09-27

    原文格式PDF

  • 申请/专利权人 MITSUBISHI HEAVY IND LTD;

    申请/专利号JP19930086761

  • 发明设计人 YAMAGAMI TETSUJI;

    申请日1993-03-22

  • 分类号E01D15/10;

  • 国家 JP

  • 入库时间 2022-08-22 04:51:55

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号