首页> 外文会议>International Conference on Industrial Engineering and Engineering Management >Research on Application of Fast-track Construction Method (ID: 1-012)
【24h】

Research on Application of Fast-track Construction Method (ID: 1-012)

机译:快速通道施工方法的应用研究(ID:1-012)

获取原文

摘要

In modern construction, time equals money. Fast-track saves your time, your money with an early start, no seasonal delays and early occupancy. We cut construction costs and you commence revenue flow sooner. Fast-track construction method means that a chief construction management unit dominates design and construction, it can debase the cost, shorten the date and improve the benefit by means of the link of design, bid and construction. From the basic meanings of fast-track construction method, we pointed such engineering project which need difficult technology, have certain scale and incertitude may adopt this kind of method by analyzing its economics principle and economic boundary. In different management mode of construction project, general contract of engineering and CM management mode may apply it.
机译:在现代建筑中,时间等于金钱。快速通道可以尽早开始,为您节省时间和金钱,没有季节性的延误和提早入住。我们削减了建设成本,您可以更快地开始收入流。快速施工法是指由首席施工管理部门主导设计和施工,它可以降低成本,缩短工期并通过设计,投标和施工的链接来提高效益。从快速通道法的基本含义出发,通过分析其经济原理和经济边界,指出需要技术难,有一定规模和不确定性的工程项目可以采用这种方法。在不同的建设项目管理模式下,可以采用工程总承包和CM管理模式。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号