Research on Application of Fast-track Construction Method (ID: 1-012)

机译:快速轨道施工方法的应用研究(ID:1-012)

获取原文

摘要

In modern construction, time equals money. Fast-track saves your time, your money with an early start, no seasonal delays and early occupancy. We cut construction costs and you commence revenue flow sooner. Fast-track construction method means that a chief construction management unit dominates design and construction, it can debase the cost, shorten the date and improve the benefit by means of the link of design, bid and construction. From the basic meanings of fast-track construction method, we pointed such engineering project which need difficult technology, have certain scale and incertitude may adopt this kind of method by analyzing its economics principle and economic boundary. In different management mode of construction project, general contract of engineering and CM management mode may apply it.
机译:在现代建设中,时间等于金钱。 快速轨道节省了您的时间,您的钱早期开始,没有季节性延误和早期入住。 我们削减了建筑成本,越早开始收入流量。 快速轨道施工方法意味着一家首席施工管理单元主导设计和施工,它可以贬低成本,缩短日期,通过设计,出价和建设的联系,提高利益。 从快速轨道施工方法的基本含义,我们指出了这种需要困难技术的工程项目,通过分析其经济学原理和经济边界,具有一定的规模,行为可以采用这种方法。 在建设项目的不同管理模式下,工程和CM管理模式的一般合同可以应用它。

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号