首页>
外国专利>
Production manner of application stone for engineering works construction thing and application stone for engineering works construction thing and usage of application stone for engineering works construction thing, application stone unit and engineering works construction ones null for engineering works construction thing
Production manner of application stone for engineering works construction thing and application stone for engineering works construction thing and usage of application stone for engineering works construction thing, application stone unit and engineering works construction ones null for engineering works construction thing
PROBLEM TO BE SOLVED: To facilitate piling-up construction of natural stones and, at the same time, construct a stable and firm civil engineering structure even in the case where such piling-up construction of natural stones is carried out. ;SOLUTION: The basic end of a bar-shaped member 4 is combined with a natural stone 2, and a civil engineering structure construction stone 1 having a curl section 15 as a frictional force increasing device on the front end of the bar-shaped member 4 is prepared. A plurality of civil engineering structure construction stones 1 are used to successively pile up the natural stones 2, at the same time, the bar-shaped members 4 are parallel arranged, the bar- shaped members 4 are embedded with crushed stones 13, etc., to ensure strong frictional force (interlocking force) based on the crushed stones 13, etc., and curl section 15, etc.;COPYRIGHT: (C)2000,JPO
展开▼