首页> 外文会议>Construction research congress >A Construction Workflow Model for Analyzing the Impact of In-Project Variability
【24h】

A Construction Workflow Model for Analyzing the Impact of In-Project Variability

机译:建筑工作流模型,用于分析项目内部变异性的影响

获取原文

摘要

In construction, workflow variability has been associated with poor project performance such as higher work in process, longer activity durations, and project completion delays. In this paper, we analyze the advantages and limitations of state-of-the-art tools and methods for managing workflow in the field, seeking to understand the importance of measuring the activity flows to anticipate variability in the activities' execution. We found that current methods are insufficient to help field managers understand the impact that variability in the activity flows has on activity execution, and understand how variability is propagated between activities. As a result, field managers cannot anticipate the impact of workflow variability and rely on their experience and intuition managing workflow variability during look-ahead planning. We propose a theoretically based workflow model that formally represents construction workflow variability to help field managers analyze the in-project workflow variability and its impact on downstream activities. We developed the model by extending existing representations of construction workflow with the mechanisms that cause workflow variability.
机译:在施工中,工作流程变异性与项目性能差,如过程中更高的工作,更长的活动持续时间和项目完成延误等项目性能。在本文中,我们分析了最先进的工具和方法的优缺点和用于管理现场工作流程的方法,寻求了解测量活动流量的重要性,以预测活动执行中的可变性。我们发现当前的方法不足以帮助现场管理人员了解活动流程中变异性对活动执行的影响,并了解如何在活动之间传播可变性。因此,现场管理人员无法预测工作流程变异性的影响,并依赖于期间期间的工作流程变异性和直觉管理工作流程变异性。我们提出了理论上基于的工作流程模型,正式代表了施工工作流程的变化,以帮助现场管理人员分析项目内工作流程变异性及其对下游活动的影响。我们通过将现有的施工工作流的表达扩展到导致工作流程变异性的机制来开发了该模型。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号