Analysis of workflow variability and its impacts on productivity and performance in construction of multistory buildings

机译:多层建筑施工中工作流变异性及其对生产力和性能的影响分析

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The meeting of milestones presents a constant challenge in construction projects. One root cause behind this challenge is the presence of variability in the project workflow. In fact, impacts of variability at both the trade contractor level and project level remain difficult to manage. This paper aims to analyze impacts of variability in the workflow caused by rework and fluctuating work quantities. Toward this end, production data of two residential construction companies were collected, and a mixed method of mathematical and simulation modeling was used to analyze performance and productivity at both the trade and project levels. Performance metrics such as completion times, workin- process levels, and delays were then measured in different real-life production scenarios. The findings clearly show that the workflow variability significantly downgrades performance metrics by causing inflated completion times, longer queues of uncompleted jobs, and excessive delays, resulting in productivity loss. The paper provides those who manage construction projects with recommendations on stabilizing the workflow in the interconnected network of trade contractors to improve productivity and performance. This study contributes to the body of knowledge in engineering management by enhancing the insight into workflow variability and its impacts on tangible performance measures.
机译:里程碑会议对建筑项目提出了持续的挑战。这一挑战背后的根本原因是项目工作流程中存在可变性。实际上,贸易承包商级别和项目级别的可变性影响仍然难以管理。本文旨在分析返工和工作量波动对工作流程可变性的影响。为此,收集了两家住宅建筑公司的生产数据,并使用了数学和模拟建模的混合方法来分析贸易和项目级别的性能和生产率。然后,在不同的实际生产场景中测量了诸如完成时间,工作流程级别和延迟之类的性能指标。这些发现清楚地表明,工作流程的可变性会导致完成时间过长,未完成工作的队列更长以及延迟过多,从而导致生产力下降,从而大大降低了性能指标。本文为那些管理建筑项目的人士提供了有关稳定贸易承包商互连网络中工作流程以提高生产率和绩效的建议。这项研究通过增强对工作流可变性及其对有形绩效指标的影响的洞察力,为工程管理领域的知识体系做出了贡献。

著录项

  • 作者

    Arashpour M;

  • 作者单位
  • 年度 2015
  • 总页数
  • 原文格式 PDF