首页> 外文会议>Rapid excavation and tunneling conference >MULTI-MODE TBMs-STATE OF THE ART AND RECENT DEVELOPMENTS
【24h】

MULTI-MODE TBMs-STATE OF THE ART AND RECENT DEVELOPMENTS

机译:多模式TBMS状态和最近的发展

获取原文

摘要

Tunnel alignments with variable ground conditions have become commonplace challenges for many underground projects. The conditions along the course of the tunnel often range from stable rock faces to soft, water bearing soils. Standard technologies for shielded TBMs have been optimized to handle a wider range of specific ground conditions. Technical and commercial limits are often reached when variable ground conditions become too extensive. Multi-Mode or hybrid machines incorporate the possibility to operate in different modes and therefore adapt the excavation technology in the tunnel to the actual ground conditions encountered. The paper will highlight case histories and latest developments, especially the new Herrenknecht Variable Density TBM design.
机译:具有可变地面条件的隧道对准已经成为许多地下项目的挑战。沿着隧道过程的条件通常从稳定的岩面向柔软,水轴承的土壤。已经优化了屏蔽TBMS的标准技术以处理更广泛的特定地面条件。当可变地面条件变得过于广泛时,通常达到技术和商业限制。多模或混合机器采用不同模式操作的可能性,从而使隧道中的挖掘技术适应遇到的实际地面条件。本文将突出案例历史和最新发展,尤其是新的Herrenknecht可变密度TBM设计。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号