ONSITE ASSEMBLY AND HARD ROCK TUNNELING AT THE JINPING-II HYDROPOWER STATION POWER TUNNEL PROJECT

机译:金平-II水电站电力隧道项目的现场装配和硬岩隧道

获取原文

摘要

Unique onsite assembly of a 12.43 m Main Beam TBM and back-up system was completed on September 18, 2008 in the remote mountains of the Sichuan province of China. The equipment was assembled onsite, without previously having been assembled and tested in a factory, utilizing a method called Onsite First Time Assembly (OFTA). The Jinping-ll hydroelectric project features four parallel headrace tunnels approximately 18 km long, two of which will be excavated by TBMs and two by drill and blast. A nearby fifth tunnel is being excavated by a 7.2 m TBM to draw down ground water in advance of excavating the headrace tunnels. This paper addresses the following topics: 1. Project description including geology and terrain; 2. The decision process leading to onsite first time assembly, the assembly process and logistics, and lessons learned; 3. Design features of the TBM and back-up system; and 4. Operational history from startup to the writing of the paper.
机译:12.43米主梁TBM和备份系统的独特现场装配于2008年9月18日在中国四川省偏远山区完成。该设备在现场组装,未在工厂中组装和测试,利用名为现场第一次装配(OFTA)的方法。 Jinping-LL水电项目具有四个平行的头部隧道,大约18公里,其中两个是由TBMS和Birl和Blast挖掘出来的。通过7.2米的TBM挖掘附近的第五隧道,以便在挖掘头部隧道之前抽取地面水。本文讨论了以下主题:1。项目描述包括地质和地形; 2.导致现场首次组装,装配过程和物流以及学习的经验教训; 3. TBM和备份系统的设计特征; 4.从启动到纸张的操作历史。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号