首页> 外国专利> The methods of building hydropower generation system include: building a turbine room, drilling the first tunnel, installing pipes in the first tunnel, constructing the second tunnel, drilling the second tunnel, installing at least one cable; and List. EMA energy generation.

The methods of building hydropower generation system include: building a turbine room, drilling the first tunnel, installing pipes in the first tunnel, constructing the second tunnel, drilling the second tunnel, installing at least one cable; and List. EMA energy generation.

机译:建造水力发电系统的方法包括:建造涡轮机房,在第一隧道中钻孔,在第一隧道中安装管道,在第二隧道中建造,在第二隧道中钻孔,安装至少一条电缆。和列表。 EMA能量产生。

摘要

Construction method of Generation System, comprising: Building a Fourth Turbine, Drilling a First Tunnel, installation of pipe in the first Tunnel, Build a Second ConduitTo define a Second Tunnel Drilling, install at least one Turbine Generator, install at least one Power cable; and System.
机译:发电系统的建造方法,包括:建造第四涡轮机,在第一隧道中钻探,在第一隧道中安装管道,建造第二导管,以定义第二隧道钻探,安装至少一个涡轮发电机,安装至少一根电力电缆;和系统。

著录项

  • 公开/公告号CL2011000351A1

    专利类型

  • 公开/公告日2011-08-26

    原文格式PDF

  • 申请/专利权人 PAUL JANKEL;

    申请/专利号CL20110000351

  • 发明设计人 PAUL JANKEL.;

    申请日2011-02-18

  • 分类号E02B9/00;F03B13/06;

  • 国家 CL

  • 入库时间 2022-08-21 18:07:00

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号