首页> 外文会议>Conference of the Australian Society of Sugar Cane Technologists >EVALUATION OF BOILER PARTIAL HOPPER EVACUATION SYSTEM AT PLEYSTOWE MILL
【24h】

EVALUATION OF BOILER PARTIAL HOPPER EVACUATION SYSTEM AT PLEYSTOWE MILL

机译:Pleystowe磨机锅炉部分料斗疏散系统评估

获取原文

摘要

A PARTIAL hopper evacuation system was evaluated on Pleystowe Mill No.2 boiler in the 2006 season. With positive results, a full hopper evacuation system was retrofitted to Pleystowe Mill's No.2 boiler in time for the 2007 crush season. Results in the2007 season were positive. The fully installed system included evenly distributed air extraction from a dry multi-cyclone dust collector, ducting extracted flue gas to a small wet scrubber, extraction fan, and return flue gas ducting. This paper addresses the genesis, design philosophy, and implementation of this installation and proposes that for other boilers, similar retrofit installations could achieve reductions in emissions without a full wet scrubber installation.
机译:在2006年赛季,对Pleystowe Mill No.2锅炉进行了一部分料斗疏散系统。凭借积极的成果,全料斗疏散系统在2007年崩溃季节及时对Pleystowe Mill的第2号锅炉进行了改装。结果在2007季度呈阳性。完全安装的系统包括干燥多旋风集尘器的均匀分布式空气提取,管道提取烟气向小湿式洗涤器,提取风扇和返回烟气管道。本文涉及该装置的创世纪,设计理念和实施,并提出用于其他锅炉,类似的改造装置可以在没有完整的湿式洗涤器安装的情况下达到排放的降低。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号