首页> 外文会议>World conference on structural control;2WCSC >Feasibility study: Control of a cable-stayed bridge model Part I: problem definition
【24h】

Feasibility study: Control of a cable-stayed bridge model Part I: problem definition

机译:可行性研究:斜拉桥模型的控制第一部分:问题定义

获取原文

摘要

The control of very flexible bridge structures has not been studied to the extent that buildings have. As a result, little expertise has been accumulated. Thus, there is a consensus within the community that a benchmark problem at this stage would be premature. In its place, it is proposed that an analytical feasibility study be performed on a well-studied and documented bridge model, in order to identify and resolve important issues and problems associated with attempting to control a flexible bridge structure. Perhaps most importantly, since active control of medium and long span bridges has little history associated with it, the study will remain as open-ended as possible.
机译:尚未对建筑物非常灵活的桥梁结构的控制进行研究。结果,积累了很少的专业知识。因此,社区内部达成共识,即现阶段的基准问题为时过早。取而代之的是,建议对经过充分研究和记录的桥梁模型进行分析可行性研究,以识别和解决与尝试控制柔性桥梁结构相关的重要问题。也许最重要的是,由于对中长跨度桥梁的主动控制几乎没有相关的历史,因此这项研究将尽可能保持开放性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号