首页> 外文会议>World conference on structural control;WCSC >Feasibility study:control of a cable-stayed bridge model part I:problem definition
【24h】

Feasibility study:control of a cable-stayed bridge model part I:problem definition

机译:可行性研究:斜拉桥模型控制第一部分:问题定义

获取原文

摘要

The control of very flexible bridge structures has not been studied to the extent that buildings have.As a result,little expertise has been accumulated.Thus,there is a consensus within the community that a benchmark problem at this stage would be premature.in its place,it is proposed that an analytical feasibility study be performed on a well-studied and documented bridge model,in order to identify and resolve important issues and problems associated with attempting to control a flexible bridge structure.Perhaps most importantly,since active control of medium and long span bridges has little history associated with it,the study will remain as open-ended as possible.
机译:对非常灵活的桥梁结构的控制尚未进行到建筑物所能达到的程度的研究。结果,积累了很少的专业知识。因此,社区内部达成共识,即现阶段的基准问题为时过早。因此,建议对经过充分研究和记录的桥梁模型进行分析可行性研究,以识别和解决与尝试控制柔性桥梁结构相关的重要问题。也许最重要的是,由于对桥梁的主动控制中跨和大跨度桥梁几乎没有相关的历史,这项研究将尽可能保持开放性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号