NOISE CONTROL DESIGN STRATEGIES FOR REFINING AND PETROCHEMICAL PLANTS

机译:炼油厂和石化厂的噪声控制设计策略

获取原文

摘要

Noise control design for major refining and petrochemical plant projects has been examinedfrom both the plant owners and engineering contractor’s perspectives. The importance ofidentifying and addressing noise control design issues as early as possible in the project schedulehas been highlighted. This ensures that the required noise abatement can be incorporated in to theoverall design with minimum impact on project cost and schedule. The front-end loading ofproject noise control design can only be achieved with effective plant noise modeling. Thisfacilitates the quantification and analysis of the noise control design options early in a projectschedule.Successful project noise control requires clear unambiguous noise limits, which are consistentwith the project type and contract arrangements. This can only be achieved if the noise controlissues are identified and resolved early in the project schedule. An effective noise control designstrategy must provide a structure for the efficient execution and management for noise control onthese major engineering projects from the detailed design phase of the project throughcommissioning and startup.
机译:已从工厂所有者和工程承包商的角度审查了大型炼油和石化工厂项目的噪声控制设计。强调了在项目进度表中尽早识别和解决噪声控制设计问题的重要性。这样可以确保将所需的噪声消除功能纳入整体设计中,并且对项目成本和进度的影响最小。项目噪声控制设计的前端加载只能通过有效的工厂噪声建模来实现。这有助于在项目时间表的早期量化和分析噪声控制设计方案。成功的项目噪声控制需要明确的明确噪声限制,这与项目类型和合同安排一致。只有在项目进度表的早期就确定并解决了噪声控制问题,才能实现这一目标。有效的噪声控制设计策略必须提供一个结构,以便从项目的详细设计阶段到调试和启动,对这些主要工程项目进行有效的噪声控制执行和管理。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号