Large cross-section shield tunnel passing right under the Jyoban and Hibiya railway lines: Minowa Tunnel of the Tsukuba Express line

机译:大断面盾构隧道在Jyoban和日比谷铁路线的正下方通过:筑波快线的Minowa隧道

获取原文
获取原文并翻译 | 示例

摘要

The Minowa Tunnel, constructed by the slurry shield method with an outer shield diameter of 10.2 mm, passed obliquely right under railway lines in service (Tokyo Metro Hibiya, JR freight, and JR Jyoban lines) for a length of about 300 m. The construction conditions were severe because the overburden of the tunnel in the intersection area is thin (1.2 to 0.4 times the tunnel diameter), an alluvial clay layer with N-values of 0 to 6 is prevalent in the area, and a sandy soil susceptible to collapse is present in the upper part of the tunnel. To ensure the integrity and safety of the railway facilities while operating the existing railway lines on usual schedule, the tunnel was constructed by preventing slurry eruption during shield advancement and suppressing abrupt settlement of the railway tracks.
机译:由泥浆盾构法建造的Minowa隧道的外盾直径为10.2毫米,正好在服务中的铁路线(东京地铁日比谷线,JR货运线和JR京阪线)的下方倾斜通过,长度约为300 m。由于交叉口区域的隧道覆盖层薄(隧道直径的1.2至0.4倍),N值为0至6的冲积粘土层普遍存在且沙质土壤易受影响,因此施工条件严峻。隧道的上部存在坍塌。为了在按常规计划运营现有铁路线的同时确保铁路设施的完整性和安全性,通过防止盾构前进过程中泥浆喷发并抑制铁轨的突然沉降来建造隧道。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号