首页> 外文会议>International Conference on Innovation amp; Management; 20051029-30; Wuhan(CN) >A Research on the Risks and Prevention Strategies of BOT Project
【24h】

A Research on the Risks and Prevention Strategies of BOT Project

机译:BOT项目的风险与防范策略研究

获取原文
获取原文并翻译 | 示例

摘要

BOT (build-operation-transfer) project is extensively applied in infrastructure construction in the world. However, due to the complexity of the project, a lot of risks will be aroused in the process of implementing. Therefore, how to guard against the risks becomes the core of the project implementation. This paper has discussed the risk characteristics of BOT project, and analyzed the existent risks. It has put forward countermeasure strategy of BOT project risks. Three-dimension system of countermeasure strategy should be established, and contract management should be strengthened. What's more, the reasonable risk-sharing principle must be established so as to effectively guard against risks.
机译:BOT(建造,运营,转让)项目在全球基础设施建设中得到广泛应用。但是,由于项目的复杂性,在实施过程中会引起很多风险。因此,如何防范风险成为项目实施的核心。本文讨论了BOT项目的风险特征,并对存在的风险进行了分析。提出了BOT项目风险的对策策略。建立对策战略的三维体系,加强合同管理。此外,必须建立合理的风险分担原则,以有效防范风险。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号