【24h】

Stability of Temporary Railway Trestle Crossing Deep Excavation

机译:临时铁路栈桥穿越深基坑的稳定性

获取原文

摘要

Ningbo high speed rail station located in the Southeast coastal area of china is one of the newestcomprehensive transportation hub that integrates railway station, subway station and other transfertransportation tool. The foundation pit of the project stretches an area of 265m×124m and a depth of24m. Soil in this area has unfavorable characteristics such as compressibility, sensitivity. A series ofprecautionary measures were adopted in design and construction which facilitated theunprecedented in china the non-phased massive excavation and building of the station house bytemporarily adding a trestle spanning over the foundation pit. This creative technique not onlysaved nearly 1/3 of the construction period compared to the traditional way but also the project cost.In this article the impact on deformation, dynamic characteristic and the vehicle-bridge couplingvibration of the temporary trestle from soil upheaval due to unloading during excavation is studied.
机译:宁波高铁站​​位于中国东南沿海地区,是集火车站,地铁站及其他换乘工具于一体的最新综合交通枢纽之一。该项目基坑面积265m×124m,深度24m。该地区的土壤具有诸如可压缩性,敏感性等不利特性。在设计和施工中采取了一系列预防措施,通过在基坑上临时增加一个栈桥,为中国前所未有的大型分站开挖和建造车站房提供了便利。这种创新的技术不仅比传统方法节省了近1/3的工期,而且还节省了工程造价。本文对卸荷土壤动荡对临时栈桥的变形,动力特性和车桥耦合振动的影响在开挖过程中进行了研究。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号