首页> 外文会议>INCOSE 2009 symposium: East meets west: the human dimension to systems engineering >A Risk-Driven Process Decision Table to GuideSystem Development Rigor
【24h】

A Risk-Driven Process Decision Table to GuideSystem Development Rigor

机译:指导系统开发严谨性的风险驱动流程决策表

获取原文
获取原文并翻译 | 示例

摘要

The Incremental Commitment Model (ICM) organizes systems engineering andrnacquisition processes in ways that better accommodate the different strengths and difficultiesrnof hardware, software, and human factors engineering approaches. As with other modelsrntrying to address a wide variety of situations, its general form is rather complex. However, itsrnrisk-driven nature has enabled us to determine a set of twelve common risk patterns andrnorganize them into a decision table that can help new projects converge on a process that fitsrnwell with their particular process drivers. For each of the twelve special cases, the decisionrntable provides top-level guidelines for tailoring the key activities of the ICM, along withrnsuggested lengths between each internal system build and each external system incrementrndelivery. This paper elaborates on each of the twelve cases and provides examples of their use.
机译:增量承诺模型(ICM)以更好地适应硬件,软件和人为因素工程方法的不同优势和困难的方式组织系统工程和采购流程。与尝试解决各种情况的其他模型一样,其一般形式也相当复杂。但是,其由风险驱动的特性使我们能够确定12种常见风险模式的集合,并将其组织到决策表中,该表可以帮助新项目收敛于适合其特定流程驱动程序的流程。对于这十二种特殊情况中的每一种,决策表都提供了用于调整ICM关键活动的顶级指南,以及每个内部系统构建与每个外部系统增量交付之间的建议长度。本文详细阐述了这十二种情况,并提供了其用法示例。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号