A Risk-Driven Process Decision Table to Guide System Development Rigor

机译:引导系统开发严谨的风险驱动过程决策表

获取原文

摘要

The Incremental Commitment Model (ICM) organizes systems engineering and acquisition processes in ways that better accommodate the different strengths and difficulties of hardware, software, and human factors engineering approaches. As with other models trying to address a wide variety of situations, its general form is rather complex. However, its risk-driven nature has enabled us to determine a set of twelve common risk patterns and organize them into a decision table that can help new projects converge on a process that fits well with their particular process drivers. For each of the twelve special cases, the decision table provides top-level guidelines for tailoring the key activities of the ICM, along with suggested lengths between each internal system build and each external system increment delivery. This paper elaborates on each of the twelve cases and provides examples of their use.
机译:增量承诺模型(ICM)以更好的方式组织系统工程和采集过程,更好地适应硬件,软件和人为因素工程方法的不同优势和困难。与尝试解决各种情况的其他模型一样,其一般形式相当复杂。但是,其风险驱动的性质使我们能够确定一组十二个常见的风险模式,并将它们组织成一个决策表,可以帮助新项目收敛于适合其特定流程驱动程序的过程。对于每个12个特殊情况,决策表提供了用于量身定制ICM的关键活动的顶级指南,以及每个内部系统构建和每个外部系统增量交付之间的建议长度。本文详细说明了12个案例中的每一个,并提供了他们使用的例子。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号