首页> 外文会议>IEEE Grenoble Power Tech >Wind power ultra-short-term forecasting method combined with pattern-matching and ARMA-model
【24h】

Wind power ultra-short-term forecasting method combined with pattern-matching and ARMA-model

机译:模式匹配与ARMA模型相结合的风电超短期预报方法

获取原文

摘要

In accordance with 0∼6 hour ultra-short-term forecasting of wind power, a method combine two ways of forecasting is put forward in this paper, in this method, Pattern-matching is used to make a 0∼24 hour forecasting by taking the data of the day before the forecasting day as input, ARMA-model forecasting is used to make a 0∼1 hour forecasting, combine the two results of forecasting to get a 0∼6 hour forecasting result. The example shows this method can improve the accuracy of ultra-short-term wind power forecasting compared to traditional ARMA-model forecasting.
机译:针对风电的0〜6小时超短期预报,提出了一种结合两种预报方式的方法,该方法采用模式匹配法,通过对风电进行0〜24小时的预报。输入预报日前一天的数据作为输入,使用ARMA模型预报进行0〜1小时的预报,将两个预报结果相结合,得出0〜6小时的预报结果。实例表明,与传统的ARMA模型预测相比,该方法可以提高超短期风电预测的准确性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号