首页> 外文会议>Computers in railways XII: Computer system design and operation in railways and other transit systems >A novel peak power demand reduction strategy under a moving block signalling system
【24h】

A novel peak power demand reduction strategy under a moving block signalling system

机译:动块信号系统下的新型峰值功率需求降低策略

获取原文
获取原文并翻译 | 示例

摘要

The Moving Block Signalling (MBS) system is a system where the tracking target point of the following train is moving forward with the leading train. In the MBS system, a dense queue of trains starting (or re-starting) in very close succession would cause an overload of the substations. The time delay and acceleration rate limit are introduced in the traditional approaches to solve this problem. However, such approaches increase the travel time between the successive stations, and the service quality decreases. In this paper, a novel approach 'Service Headway Braking' (SHB) is proposed based on some knowable extra station dwell time. It can efficiently avoid the peak electrical demand problem without increasing the time delay. The simulation result shows that, with flexible adjustment of the start (or restart) time and velocity, the passenger waiting time can be shortened while considering energy saving.
机译:移动块信号(MBS)系统是跟随列车的跟踪目标点与领先列车一起前进的系统。在MBS系统中,密集的列车队列非常紧密地连续启动(或重新启动)会导致变电站的过载。在传统方法中引入了时延和加速度限制,以解决此问题。但是,这样的方法增加了相继站点之间的旅行时间,并且服务质量降低了。在本文中,基于一些已知的额外站点停留时间,提出了一种新颖的方法“服务行车制动”(SHB)。它可以有效避免高峰用电问题,而不会增加时间延迟。仿真结果表明,通过灵活地调整启动(或重启)时间和速度,可以在考虑节能的同时缩短乘客的等待时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号