首页> 外国专利> POWER DEMAND/SUPPLY SYSTEM, POWER SUPPLY CONTROL DEVICE, POWER RECEIPT CONTROL DEVICE, GREEN POWER SUPPLY CONTROL DEVICE, GREEN POWER RECEIPT CONTROL DEVICE, GREEN POWER DEMAND/SUPPLY CERTIFICATION DEVICE, POWER BLENDING CONTROL DEVICE, GREEN POWER DEMAND/SUPPLY FARE ADJUSTMENT DEVICE, MOVING BODY, BUILDING, GREEN POWER DEMAND/SUPPLY SYSTEM, GREEN POWER TRANSMISSION/RECEPTION METHOD, GREEN POWER DEMAND/SUPPLY CERTIFICATION METHOD, POWER BLENDING METHOD, FARE ADJUSTMENT METHOD, AND POWER BLENDING PROGRAM

POWER DEMAND/SUPPLY SYSTEM, POWER SUPPLY CONTROL DEVICE, POWER RECEIPT CONTROL DEVICE, GREEN POWER SUPPLY CONTROL DEVICE, GREEN POWER RECEIPT CONTROL DEVICE, GREEN POWER DEMAND/SUPPLY CERTIFICATION DEVICE, POWER BLENDING CONTROL DEVICE, GREEN POWER DEMAND/SUPPLY FARE ADJUSTMENT DEVICE, MOVING BODY, BUILDING, GREEN POWER DEMAND/SUPPLY SYSTEM, GREEN POWER TRANSMISSION/RECEPTION METHOD, GREEN POWER DEMAND/SUPPLY CERTIFICATION METHOD, POWER BLENDING METHOD, FARE ADJUSTMENT METHOD, AND POWER BLENDING PROGRAM

机译:电源需求/电源系统,电源控制设备,电源接收控制设备,绿色电源控制设备,绿色电源接收控制设备,绿色电源需求/电源认证设备,电源混合控制设备,绿色电源需求/电源票价调整移动的身体,建筑物,绿色电力需求/供应系统,绿色电力传输/接收方法,绿色电力需求/电源认证方法,电力混合方法,票价调整方法和电力混合程序

摘要

PROBLEM TO BE SOLVED: To achieve the traceability of green power to make alternation impossible.;SOLUTION: This green power demand/supply certification device 1 is provided with: a power transmission/reception completion report verification part 21 for comparing power transmission result information (power transmission completion report d3) transmitted from a power transmission source which transmits green power with power reception result information (power reception completion report d4) transmitted from a power transmission destination which receives the green power from the power transmission source to verify the presence/absence of matching; and a demand/supply information processing part 22 for making the power transmission result information associated with power reception result information, determined to be matched by the power transmission/reception completion report verification part 21 to generate demand/supply information d5 including the power transmission source, the power transmission destination and the power transmission/reception electrical energy of the green power.;COPYRIGHT: (C)2011,JPO&INPIT
机译:解决的问题:为了实现绿色电力的可追踪性以使得不可能进行交替。解决方案:该绿色电力需求/供应证明装置1具有:电力发送/接收完成报告验证部分21,用于比较电力发送结果信息(从发送绿色功率的功率发送源发送的功率发送完成报告d3)以及从从功率发送源接收绿色功率以验证是否存在的功率发送目的地发送的功率接收结果信息(功率接收完成报告d4)匹配需求/供应信息处理部分22,用于使与受电结果信息相关联的输电结果信息确定为与受电完成报告验证部分21匹配,以生成包括输电源的需求/供应信息d5 ,绿色能源的送电目的地和送电/接收电能。;版权所有:(C)2011,日本特许厅&INPIT

著录项

  • 公开/公告号JP2011164700A

    专利类型

  • 公开/公告日2011-08-25

    原文格式PDF

  • 申请/专利权人 OMRON CORP;

    申请/专利号JP20100023396

  • 发明设计人 KUNO ATSUSHI;

    申请日2010-02-04

  • 分类号G06Q50;H02J3;H02J13;H01M8;

  • 国家 JP

  • 入库时间 2022-08-21 18:24:50

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号