KWAJALEIN ATOLL DEPARTMENT OF PUBLIC WORKS PROJECT PRIORITIZATION MODEL

机译:大众工程项目优先权模型的KWAJALEIN部门

获取原文
获取原文并翻译 | 示例

摘要

A three person cadet team conducted a study to develop a project prioritization model for the Kwajalein Department of Public Works (DPW). U.S. Army Kwajalein Atoll (USAKA) is located in Republic of the Marshall Islands and serves as a strategic installation for the Space and Missile Defense Command (SMDC). USAKA's mission is critical and will remain a part of SMDC for years to come. USAKA is facing a tremendous challenge: the airfield is deteriorating; the power generation plant has four turbines down; the water treatment plant is need of repair; the wastewater treatment plant is developing massive challenges; etc. The deteriorated condition of this critical infrastructure threatens the mission of SMDC. Kwajalein's remote location and the corrosive natural environment add to these challenges. Currently, USAKA installation management is under the control SMDC. This is problematic for the DPW when trying to balance projects for the installation and the SMDC mission. Under a more intense resource constrained environment, the ability to objectively select projects that balance the mission and installation requirements is even more demanding. Using the Systems Decision Process as a construct for analyzing and developing the value model, the cadets conducted a problem definition phase to include a literature review, stakeholder analysis, functional requirements analysis and value modeling. Additionally, they traveled to Kwajalein to better understand the challenges faced by the DPW. The model will assist the Kwajalein DPW to objectively prioritize projects that will meet the needs of both the installation and the mission.
机译:一个由三人组成的学员小组进行了一项研究,以为夸贾林公共工程部(DPW)开发项目优先级模型。美军夸贾林环礁(USAKA)位于马绍尔群岛共和国,是太空与导弹防御司令部(SMDC)的战略装置。 USAKA的使命至关重要,并将在未来数年内继续成为SMDC的一部分。 USAKA面临着巨大的挑战:飞机场在恶化;发电厂的涡轮机下降了四个;水处理厂需要维修;废水处理厂面临着巨大的挑战;这种关键基础设施的恶化状况威胁到SMDC的任务。夸贾林的偏远地区和腐蚀性自然环境加剧了这些挑战。目前,USAKA安装管理处于SMDC的控制之下。对于DPW,当试图平衡安装和SMDC任务的项目时,这是个问题。在资源更加紧张的环境下,客观地选择能够平衡任务和安装要求的项目的能力变得更加苛刻。学员使用系统决策过程作为分析和开发价值模型的架构,进行了问题定义阶段,包括文献复习,利益相关者分析,功能需求分析和价值建模。此外,他们前往夸贾林,以更好地了解DPW面临的挑战。该模型将帮助Kwajalein DPW客观地确定满足安装和任务需求的项目的优先级。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号