首页> 外文会议>WEFTEC 2012;Water Environment Federation annual technical exhibition and conference >INTERCEPTOR REHAB LAS VEGAS STYLE - A FAST TRACK APPROACH FOR THE DOWNTOWN INTERCEPTOR
【24h】

INTERCEPTOR REHAB LAS VEGAS STYLE - A FAST TRACK APPROACH FOR THE DOWNTOWN INTERCEPTOR

机译:INTERCEPTOR REHAB拉斯维加斯风格-DOWNTOWN INTERCEPTOR的快速跟踪方法

获取原文
获取原文并翻译 | 示例

摘要

The City of Las Vegas Downtown Interceptor Sewer was constructed in the early 1980’s andrnconsists of approximately 23,000 linear feet of 42- to 54-inch unlined reinforced concrete pipern(RCP). The Interceptor is a critical asset for the City of Las Vegas. The City initiated a contractrnfor a fast-track condition assessment and rehabilitation design in one-half the normal design timernto reduce the risk of a sewer collapse.rnBased on risk, a rehabilitation strategy was developed for the final design that included, not onlyrnthe Grade 4 and 5 areas, but adjacent areas that would be difficult to rehabilitate in the future duernto large traffic volumes and/or business disruption.rnThis paper presents the project steps to complete the condition assessment and design on anrnaccelerated schedule, while ensuring that limited City construction funds were only spent forrnrehabilitation in high-risk areas.
机译:拉斯维加斯市市区拦截器下水道始建于1980年代初期,由大约23,000线性英尺的42到54英寸无衬砌钢筋混凝土管道(RCP)组成。拦截器是拉斯维加斯市的重要资产。纽约市启动了一项合同,要求在正常设计时间的一半时间内进行快速状态评估和修复设计,以减少下水道坍塌的风险.rn基于风险,针对最终设计制定了修复策略,其中不仅包括4级和5个区域,但由于交通流量大和/或业务中断,将来很难修复的邻近区域。本文介绍了在加快进度的情况下完成条件评估和设计的项目步骤,同时确保有限的城市建设资金仅在高风险地区进行了康复治疗。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号